Skip to content
Floor care and janitorial from one crew Open 24/7 (469) 820-3423
Commercial Cleaning Allen logo
Bright warehouse with yellow columns and a clean floor

Industrial concrete

Warehouse Floor Scrubbing in Allen, TX

Scrubbing machines that lift the film a broom leaves behind, scheduled one zone at a time so the floor never has to stop.

What a Broom Cannot Reach

Picture a warehouse floor right after it is swept. Looks fine, mostly. But run a white rag across it and it comes up gray. That residue is a mix of fine dust, rubber from forklift tires and the oily grime that rides in on every pallet. Sweeping does not touch it. Over time it darkens the concrete, hides the aisle striping and sends dust back up onto the racks with every pass of a lift truck. Scrubbing removes it. Commercial Cleaning Allen runs rider machines on open floor and walk-behind units in narrow aisles. Each one spreads a cleaning solution, works it into the concrete with rotating brushes or pads and then pulls the dirty water up through a squeegee and vacuum, all in one trip. Behind the machine, the floor is clean and close to dry. The US-75 corridor near Allen has plenty of distribution and light industrial space, and many sites run more than one shift. We work around that by dividing the floor into zones and scrubbing each one in a quiet window or on a weekend.

Pieces of a Scrubbing Plan

We fit the plan to your layout. These pieces show up often.

  • Rack aisles

    Each aisle run end to end with a machine that fits its width.

  • Dock doors

    Rubber streaks and tracked-in grime cleared from the highest-traffic lanes.

  • Airborne dust

    Less residue on the floor means less of it floating up onto product.

  • Stubborn marks

    Repeat passes over drips and heavy streaks before they set.

  • Zone rotation

    The floor split into sections and scrubbed on a cycle.

  • Front office

    Offices, washrooms and the break area can join the same plan.

Fitting Scrubbing Around Your Shifts

  1. Survey the floor

    We look at total area, aisle sizes, dock activity and the state of the concrete, then quote.

  2. Choose windows

    Zones and times are agreed so lift trucks keep rolling, and the cycle goes into the plan.

  3. Run the cycle

    Zones are scrubbed in turn, and the supervisor checks the concrete during each review.

Why Sites Along US-75 Call Us

  • Production keeps going

    Work moves around your schedule. No shutdown required.

  • Rider and walk-behind units

    Open floor and tight corners both covered, with machines we supply.

  • Reviewed results

    The supervisor looks at the concrete itself, not just a checklist.

  • Machines provided
  • Zone cycle
  • Works around shifts
  • Calendar reviews

Does Your Concrete Leave a White Rag Gray?

Share the floor area and your shift pattern. We will survey it and send a written price and zone schedule.